Studio Tecnico Guglielmetti started out working on classic construction sites,
and evolved over the years to obtain in-depth knowledge of the entire industry.
Direct positions:
Supervision of Works, Safety Coordination during Planning, Safety Coordination during Execution, Management of Works
The world of temporary and mobile work sites is changing continually.
This is one of the fields with the most variables at play, from the type of project to be built (residential, industrial building, multi-storey building, etc.) to the site (flat land, mountainous area, coast…), the companies involved (Italian, international, large or small), the machinery used in the construction work (mobile cranes, tower cranes, concrete mixing stations, mobile elevated platforms, etc.).
This is why every site requires in-depth study by professionals in the field, in order to optimise management and offer customers serenity at all times during the work, whether it be a minor apartment renovation or a large-scale construction project.
Over the years Studio Tecnico Guglielmetti has overseen numerous construction sites in Italy and abroad, including large-scale international projects, mobilising large numbers of people in the field and acquiring all the know-how required to continue improving all aspects of site management.
Direct appointments
Working hand-in-hand with the customer right from the start:
- Management of Works;
- Safety Coordinator during Planning;
- Safety Coordinator during Execution;
- Supervision of Works.


Direct appointments
Working hand-in-hand with the customer right from the start:
- Management of Works;
- Safety Coordinator during Planning;
- Safety Coordinator during Execution;
- Supervision of Works.

Auditing
Audit comes from the Latin word for listening, conducting a true ‘audition’ involving attentive, in-depth control of numerous aspects of the construction site and the companies involved:
- First party;
- Second party.

Auditing
Audit comes from the Latin word for listening, conducting a true ‘audition’ involving attentive, in-depth control of numerous aspects of the construction site and the companies involved:
- First party;
- Second party.
Documents
Indispensable for correct site management:
- Preparation of Safety and Coordination Plan;
- Preparation of Operative Safety Plan;
- Preparation of plan for assembly, use and dismantling of scaffolding (PiMUS);
- Building permits (certified notification of start-up, sworn notice of commencement, etc.)


Documents
Indispensable for correct site management:
- Preparation of Safety and Coordination Plan;
- Preparation of Operative Safety Plan;
- Preparation of plan for assembly, use and dismantling of scaffolding (PiMUS);
- Building permits (certified notification of start-up, sworn notice of commencement, etc.)

Submit your request
Contact
Address
Via Fermi 20/22
29122 Piacenza (PC)
Phone
Mobile: +393474199019
Submit your request
Contact
Address
Via Fermi 20/22
29122 Piacenza (PC)
Phone
Mobile: +393474199019